Thermal Power Project for THDC

|
  • 0

Thermal Power Project for THDC

Thursday, 08 September 2016 | PNS

Union ministry of coal has  allocated Amelia Coal Mine to THDC India limited (THDCIl) for the implementation of Khurja Super Thermal Power Project (KSTPP) of 1320MW on 29.08.2016.

THDCIl is implementing Khurja STPP (2X660MW=1320MW) at Khurja, in Bulandshahar of Uttar Pradesh. The annual generation capacity of the Khurja STPP is 9828 MU at 85% PlF in Phase-I, that is, 2X660 MW. There is a provision of third unit (1X660MW) in Phase-II. This coal mine has been allocated to THDCIl  under the under Rule 11 (10) of the Coal Mines (Special Provisions) Rules, 2014 in public interest in order to meet the requirement of its Khurja STPP(2X660 MW).

Sunday Edition

Paris Paralympics Para athletes bask in glory and gold

15 September 2024 | Rishabh Malik | Agenda

DUBLIN'S HIDDEN GEM

15 September 2024 | AKANKSHA DEAN | Agenda

From wheels to wings

15 September 2024 | Gyaneshwar Dayal | Agenda

We hope to instil a respect for our heritage:Tarun Thakral

15 September 2024 | Pioneer | Agenda

The Monsoon’s Whisper in Every Note

15 September 2024 | SAKSHI PRIYA | Agenda