Solar power project set up at Tata Steel works

| | Jamshedpur
  • 0

Solar power project set up at Tata Steel works

Tuesday, 27 September 2022 | PNS | Jamshedpur

Tata Steel Jamshedpur works witnessed installation of a rooftop solar power project of 2.2 MWp capacity. The facility was inaugurated by Probal Ghosh, vice president, shared services, Tata Steel at Central Warehouse inside Jamshedpur works. This is the first roof top project commissioned by Tata Power under the larger agreement with Tata Steel for installation of a total 41MW at various locations with  combination of roof top , floating and ground mounted.  This is the first project commissioned in Tata Steel with greater than 1 MW capacity.

 

At Tata Steel, sustainability has always been a core principle that is embedded in its business philosophy and is backed by a long-term, holistic vision of achieving identified targets. Several definitive steps across the value chain have been undertaken to reinforce its sustainability credentials. In the recent past, power generation from solar and non-conventional energy sources have gained momentum across its operating locations. Tata Steel continues on its pursuit of clean energy solutions and expanding its renewable energy footprint.

Sunday Edition

Nurpur | A journey through hidden forts and spiritual treasures

22 September 2024 | Aditi Sharma | Agenda

Elevate Your Dining Experience with Innovative Flavours

22 September 2024 | Sharmila Chand | Agenda

Taste the Victory The Awards Celebrate Culinary Artistry

22 September 2024 | SAKSHI PRIYA | Agenda

Paris Paralympics Para athletes bask in glory and gold

15 September 2024 | Rishabh Malik | Agenda