Ranchi

SP inspects rail line extension work

Vinod Prasad

SP Kartik S took stock of the progress of railway line extension from Badki Champi to Tori. He also enquired the matter of threat by Maoists to check the work. “The extension work of railway line has not been stopped.

An Abundant security forces have been provided,” he said. The SP reached to the bridge no 27 and 33 and inspected the work.

He also took sought of Dhordhowa Bridge and temporary police picket and gave many instructions to the police personnel. On the occasion, Kuru thana-in-charge Ramashish Paswan and security forces were present.