Dehradun

lack of road links in Haridwar villages hurdle to girls' education

RADHIKA NAGRATH

Ironically, roads are turning major roadblocks for the study of the young girls who perforce travel several kilometers on foot to reach schools and do the  same on their  way back home. Many girls get dropped from schools on account of the problem. Attending college after intermediate is beyond the scope of many since travelling 25 kms daily  from their villages to Haridwar when there is hardly anything to take them to the main road is a herculean task. It  is a  pity that nearly 8000 villagers from Nalowala, Peeli Padav and Tatwala of the district are bereft of such basic facility of road access to the main roads.

Notably, over 125 students  from the three adjoining villages-Nalowala, Peeli Padav and Tatwala- go to the high schools after covering six kms on foot to reach the main road  to avail public transport. Sometimes, they cover  the  entire  stretch of 12 kms on foot. Many get hold of tempos which  are always  overloaded, putting their lives to risk. 

Neha Walia and Meeta from Tatwala village sound  eager to pursue higher education after clearing their class 10 examinations this year. However, they say they are doubtful whether things would be possible as the colleges  either in Haridwar or Kotdwar are 25 to 45 kms away from their villages.

Sounding sad over her inability to pursue higher education, Neha said while talking  to The Pioneer, “During my 10th class, we used to return after covering some distance when  it rained heavily as vehicles were unavailable with the  roads being waterlogged.

Now my parents say I should learn cycling. But would  I have  any energy  left in  me after I  cycle  over 20 kms to reach the institutionIJ”

The former gram pradhan of Peeli Padav village Poonam Jhandwal  said they had done their best to have the problem solved.

“We wrote to the PWD officials several times. Surveys were undertaken too. But things have remained the same,” she said. 

Asked about  the alleged apathy on the part of PWD on the matter,  executive engineer PWD,  Shrikant Sharma said, “We have sent the road construction proposal to the state government. As soon as the budget is sanctioned, we would start the works.”