A master plan has been prepared for various infrastructural developments in Brahmapur Railway Station, stated Khurda Road Divisional Commercial Manager (DCM) ligaraj Nanda here.
Attending a meeting of the advisory committee meeting here, Nanda said that decisions have been taken for installation of a second foot over bridge and a lift system at the Brahmapur station. He said works for the two projects would start soon.
Nanda was accompanied by Assistant Divisional Engineer Chiranjivi, Assistant Telecom Engineer Venkat Karunya and Brahmapur Station manager DP Brahma, among others. The DCM got various proposals on the development of the station and assured swift decisions on them.