Bhopal

Phase -II development work to be completed by mid-may

SR

The work of ‘Destination Development’ Bhopal Phase-2 will be completed by May-end. Under it, improvement of Manua Bhan Ki Tekri, lal Ghati Gupha Mandir complex, Shyamla Hills, Prempura ghat and Kerwa Dam will be undertaken in Bhopal city.

Tarawali Mandir complex in Berasia will be developed and adventure & water sports will be developed in Neelam Park, Bhopal. These tourist spots are being improved at a cost of Rs4.50 crore.

Development works are being carried out for the convenience of tourists at Mahavir Giri (Manua Bhan Ki Tekeri). These works include sitting arrangements for tourists, pathway for pedestrians upto the hillock, parking arrangements, construction of railing, shelter for tourists, various facilities for children, drinking water and toilet facilities, 20 garden benches and signages. These works will be completed within a month. Similarly, a shelter will be constructed for tourists at lal Ghati Gupha Mandir complex, facilities for children, other facilities for tourists and signages. At Shyamla Hills, development of Baradari and landscape development, improvement of Prempura Ghat and providing more facilities to tourists at Kerwa dam are included in the project.

Besides, in view of influx of tourists at Tarawali Mandir, its premises is being developed at a cost of Rs55 lakh. This work will be completed by the end of current month. With a view to providing new attractions to tourists, adventure and water sports will also be held in future at Neelam Park