On Oct 22, the 1,000 MW capacity KNPP unit was synchronised for the first time with the power grid at 2.45 a.m., and generated 75 MW of power. The power generation was subsequently increased to 160 MW and nearly two hours later, the unit tripped. On Oct 25 9.43 p.m., the unit was reconnected to the grid and generated around 160 MW. According to power sector officials, the power generated by KNPP now is termed as infirm power and will be supplied to the home state - Tamil Nadu.