As per the reports available, the PH level of water has increased from 4 to 5.6. “Alternate arrangement of water will be made soon for the public. Further steps will be taken only after getting reports from the expert teams on ground water status. The missing pipeline work was to be initiated from 2017 in Harmu, however, looking at the demand for water, survey of residential area will be conducted again for the purpose,” said, RMC Water Board Superintendent, Pramod Bhatt.