'709 solar pumps to be installed in Bastar distt by Mar 2018'

Published on: 

Chief Minister Raman Singh informed Chhattisgarh Assembly on Monday that a total of 709 solar pumps would be installed in Bastar district by March 2018.

In a written reply to Congress member Deepak Baij, the Chief Minister informed that there is a target to install the rest of 148 solar pumps by September 2018. 

Daily Pioneer
dailypioneer.com