New Road Over Bridge commissioned at Tetelia station yard

Published on: 

The new Road Over Bridge (ROB) at Tetelia station yard constructed by Northeast Frontier Railway was opened for the use of common public. This ROB (No 59A) was constructed by Northeast Frontier Railway at a total cost of Rs. 72 crores.

The existing road on Level crossing gate no ST-22 passes through the station yard of Tetelia station yard and it is situated on state PWD road connecting PobitoraWildlife Sanctuary. There is high detention of road traffic on account of either shunting operations or movement of trains in both directions.

Daily Pioneer
dailypioneer.com