The minister said an industrial unit is proposed to be commissioned within two years of allotment of the plot. “However, an extension of three years could be availed. The maximum timeframe is five years.” He said there were 232 plots, including 67 in industrial belt Baddi, where industrial units have not been commissioned within the timeframe.