The drilling of one of the tunnels began in December 2013 and the other in January this year using two tunnel boring machines (TBM) named "Riddhi" and "Siddhi", the Delhi Metro Rail Corporation (DMRC) said."The two TBM's emerged at the Dabri Mor station after boring 1.2 km-long twin tunnels which have been constructed at a depth of 16.5 metres and have an internal diameter of 5.8 metres. These are the first tunnels to be completed on this corridor," the DMRC said.