The work for the Saheed Nagar multi-level car parking (MlCP) which started on Monday will be completed by January 2019.
The city is going to have two MlCPs. While one is planned at Saheed Nagar, the other one will come up in Unit II area and both will be under the Smart City Project.
The MlCP building shall consist of two basements, ground and above floors of construction. The car parking building shall have lower and upper basement, and ground and above floors that will accommodate minimum 250 nos. Equivalent Car Spaces (ECS).
All the floors above the parking floors shall be commercial floors covering minimum 38,000 sqft commercial saleable space. The building will be developed in accordance with the Bhubaneswar Development Authority (BDA) norms making the building eligible for GRIHA 3-star certification.
The building shall be designed taking into consideration the accessibility and efficiency of vehicular movement for MlCP area in compliance with prevailing building standards, fire norms and structural standards. The building shall be suitably designed for senior citizens, children, and differently able people based on prevailing norms and standards. The building shall be equipped with intelligent building management system inclusive of emergency facilities, smart utilities etc. The provision for solar roof top installation shall be kept.
The MlCP building in Unit II area is envisaged to have 450 Equivalent Car Space (ECS) in the two basements, ground floor as well as first, second and third floors, while the three upper floors (4, 5 and 6) will be built as commercial spaces. Equivalent Car Space (ECS) is a unit of measuring an area to hold passenger cars.