To justify the claim, the duo argued that Andhra Pradesh would get 710.6 crore cubic metre water (58.4 per cent) out of the total 1216.5 crore cubic metre water which is proposed to be harvested by the project. According to the proposal, if the Centre constructs link canal after building a dam on the Manibhadra River, canal’s 30-km area would be in Odisha and 526 km in Andhra Pradesh, they added.