Ujjain Collector Kumar Purushottam inspected the Meghdoot Van parking lot and Mahakaleshwar Annakshetra under construction near Harifatak Bridge on Thursday.
The Collector first reached the Meghdoot Van parking site and got information about the ongoing construction work there. It is noteworthy that both the above sites are proposed to be inaugurated soon. During the inspection of the parking lot, the Collector gave instructions that the construction work of the site should be completed within the time limit.
The name of the parking space should be written in capital letters. During this, Ujjain Municipal Commissioner (Executive Director, USCL) Roshan Kumar Singh, Smart City CEO Ashish Pathak, Temple Administrator Sandeep Soni, Smart City Superintending Engineer Neeraj Pandey and the entire team of Smart City were present.