Engineers asked to ensure minimum tripping on feeders

Published on: 

Engineers posted in the field of Madhya Pradesh Power Transmission Company should ensure minimum tripping on the feeders of their respective areas so that power transmission can be supplied to the power consumers with minimum interruption. This instruction was given by MPPTCL Managing Director Er Sunil Tiwari in a meeting  of fields Exexutive Engineers in which Chief Engineer and Superintending Engineer level officers of all the faculties were also present, which was  held recently at  headqarters Jabalpur  Every tripping must be thoroughly investigated.

Er Sunil Tiwari instructed in the meeting that every tripping should be thoroughly investigated so that the reasons for the error can be resolved in time and there should be no interruption. He said that all preparations for the load season should be done from now on and the work of increasing the capacity and maintenance of transformers and lines should be completed on time.

Managing Director Er Sunil Tiwari directed that installation of transformers related to Prime Minister's Jal Shakti Mission and upgradation or construction of new Extra High Voltage lines should be done on top priority.

Daily Pioneer
dailypioneer.com