Minister for New and Renewable Energy Hardeep Singh Dang reviewed Agar-Shajapur-Neemuch proposed solar park of 1500 MW and instructed for pacing up work of the project.
Along with this important projects like 600 MW Omkareshwar Dam floating solar power project, 950MW in Chattarpur and 1400 MW project Morena.
During the review meeting, Dang gathered information in detail about the activities of the department and instructed officials for regular review.
Pradhan Mantri Kisan Urja Suraksha and Uthan Campaign Kusum A and B were reviewed and informing about the implementation of the Mukhya Mantri Solar Pump Yojana, it was mentioned that total 90 percent grant is given by the state and union government to farmers under the scheme for pumps upto 3 hp.
It should be ensured that the maximum number of farmers should be beneficiary of these schemes and special attention should be paid for this scheme. All the works should be completed in the specified time frame.
At the review Managing Director and senior divisional officers were present.