Bhopal Municipal Corporation (BMC) Commissioner K.V.S.Choudhary visited under construction LIG, EWS housing schemes under Pradhan Mantri Awas Yojana (PMAY) in Kalkheda, Neelbad area, inspected the works and proposed sites and other basic facilities including road, water, electricity.
He held detailed discussion with the officials regarding the facilities. Corporation Commissioner Chaudhary directed officers to ensure that the land holders of the Kalkheda project start the building construction work only after obtaining the building permission from the corporation.
At the inspection site engineers of the construction company were given instructions to work speedily. Chief Engineer RK Saxena was present during the inspection of the commissioner.
Plots developed in residential projects under housing schemes and under construction LIG, G+3 EWS slum RW, EWS, Non Slum Residential Blocks
works were inspected and proposed sites and other basic facilities including road, water, electricity were discussed in detail with the officials regarding the facilities.
Corporation Commissioner Chaudhary directed that no new encroachment should be done on the vacant land of the old township and ensure that encroachment and construction should not happen.
Commissioner visited Rahul Nagar near Riviera Town located in Mata Mandir
inspected the ongoing works in Phase-2 and gave instructions to work at a fast pace without wastage.
Adequate arrangements for stopping water coming out of the ground due to digging and returning. The water has disturbed the working of the site and to improve the situation he gave instructions to speed up construction work including the work of returning wall.
Instructions for extracting water by installing an additional pump to remove the area of water filled in the pit. At the time of the instruction he gave advice that this is the best time to work at the site and utilise the time efficiently so work fast and complete the foundation work soon and other works before the weather turns abrupt in the season.