The Vishnugad Pipalkoti HEP project is situated in Uttarakhand. The project has four Hydro Turbine-Generators, each of 111 MW, operating under rated net head of 212.46 m. The design and development of turbine suitable for this project was carried out by BHEl Hydro lab Engineers.The Turbine Model Test has been successfully done in Hydro lab from July 27 to August 1 in presence of engineers from THDC India ltd. The test proved the turbine capability to meet the guaranteed efficiency, output and other guaranteed parameters.